From: route@monster.com
Sent: Thursday, January 28, 2016 5:16 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Michael Hill 1030 ½ N. Magnolia Ave. #331 Anaheim, CA 92801 Mobile: 619-990-7691 E-mail: cyp4545@gmail.com Career Summary Seasoned telecom professional with years of experience, engineering,
constructing and the implementation of complex network systems, comprised of
inside & outside plant applications (campus, underground, aerial and
wireless). Overseeing contractors and sub-contractors. Working as a
contractor and sub-contractor to prime contractors or directly with end
users. Proficient in Microsoft desktop products and various test and
verification equipment. Solid background in contract negotiations, job
walks, safety, customer relations, administrative duties such as
pre-qualifying documentation, scope of work, methods of procedure,
estimating, budgeting, bid packages and project close out. Experience 1/12/2014-PresentInfinite computing/Contracted to
VerizonHuntington Beach, CA Network
Engineer · Network engineering for ISP/OSP applications · Outside plant planning for BAU and FIOS FTTH, MDU, and MTU
fiber/copper · Project management of multiple projects. · Reconcile and update multiple databases. (V-Build,ICGS) · Network mapping (Auto Cad, Bentley Microstation) · Compile vendor and contractor proposals and determine
materials and man power requirements and costs. · Joint Pole Administration · CWDM/PON/DWDM 02/22/2012-2/22/2013 Apex systems/Contracted to San Diego Gas and
ElectricSan Diego, CA Inside/ Outside
Plant Specialist · Make operational and tactical decisions that can have $1M
per day ramifications (regulatory compliance and cost of downtime). · Review design drawings or blueprints that encompass the
specific requirements involved in construction development. · Perform site surveys and field engineering assessments. · Accurately project the amount of materials, equipment, and
labor hours that must be utilized in order to complete a given project · Provide leadership for technical aspects of implementation
activities performed by internal and external resources · Change Management - managing and coordinating change
implementation by raising and recording of changes, assessing the impact,
cost, benefit and risk of proposed changes, developing business justification
and obtaining approval · Compile and report RTU(SCADA), Wire line, and Microwave
circuit impact to Mission Control (Power) and corporate IT/network
for cut overs · Research share point database for circuits down to DS1
level for cable and electronics capacity levels. · Aerial to underground conversions · Underground restoration and repair · Cable reroutes for Municipal Projects · Wood to steel pole relocations in urban and rural
areas/RUS. · Mapping and documentation of as builds. (GIS) (Auto
cad) (Google earth pro) · Pull permits, ROW encroachment/excavation, and traffic
control 03/02/04-01/20/12Fibercom ServicesCanoga Park, CA Project
Manager · Splice and test all fiber optic links for the Los
Angeles mid city light rail expansion ( Fusion splicing,
Uni-cams, MM/SM, OTDR and Power meter) · Manage safety requirements for all on track
personnel · Manage, splice, and test Metrolink Fiber Optic backbone
(Los Angeles county) · Splice and test Verizon Fios (Camarillo) · Read blue prints and prioritize job assignments · Cell sight cabling and troubleshooting RF signals. · Copper and fiber splicing. Inside/Outside plant all
counts. · Relocate ISP equipment racks and infrastructure to
accommodate new equipment. · Compile test results and as builds for final
documentation. · Installation of Scada system for MTA Mid city light rail
expansion (Los Angeles) · Engineer and splice fiber optic network for MTS San Diego
Trolley Green Line · Work with and manage crew to keep time lines and
milestones · Manage vendors and subcontractors to keep jobs on budget
and on time 2/20/02-1/14/04Cypress
Network ServicesGolden, CO Partner · Underground and aerial infrastructure construction · Duct and man hole placement · Cell sight and regeneration sight construction ALL TRADES · Install transport electronics · OSP and ISP applications · Field surveys for as build conditions · Draw red lines · Attend job walks · Spec out blueprints and prepare bid packages · Prepare scope of work and estimates/job costs · Terminate, test, and troubleshoot central office patch
panels · Splicing, termination, testing, and grounding of all cable 2/15/2000-1/03/02Adesta CommunicationsGolden, CO Supervisor-Installation ·
Manage and
train fiber optic splicing testing, and installation crews for the Denver to
Salt Lake joint build ·
Run crew
for installation, splicing, and testing of Colorado fiber backbones for Time
Warner (144 count,) MFN (432 count,) Enron (216 count.) ·
Design
floor plans in regeneration sights for installation of communications, and
power racks ·
Compute
size and capacity of EMT, and raceways for cable acceptance ·
Prepare as
builds and document duct and cable locations network wide with CAD
department. ·
Prepare
documentation in Word, Excel, Power Point, Visio, OTDR (GN Nettest (Anritsu),
FLUKE, and Agilent) formats. ·
Coordinate
with the Colorado Department of Transportation for safety and right of way
guidelines ·
Termination
of coax to optical carriers ·
Cable
locates ·
Rack and
equipment installation ·
Install
grounding busses and ground networks 4/20/96-2/01/2000Fiberlink
Telecom GroupNovato, CA Telecom
Design/Build Consultant-Business Partner · Fiber optic splicing and testing for ICG, Broadwing,
Level-3, AT &T, World Com, Bay Area Rapid Transit, City of Sacramento,
Enron, Cox Communications, Adelphia communications, Time Warner, MFN, U.S. A.
Networks, Verizon. · Design/Build ICG telecom’s core switching locations in
Downtown San Francisco, Oakland, and Sacramento . HVAC, Power, Civil · Data room design and drafting. · Estimating and job proposals · Attend job walks · ISP applications (wire wrap, coax, fiber (single and
mass), ladder racking, equipment installation, back up power, and lacing) · Prepare scope of work · Cat 3, 5, 5e termination and testing · Punch down on 66 and 110 blocks · OSP applications (Install pipe and man/hand
holes. Splicing, troubleshooting, testing, traffic control) · Administration: (payroll, AP, AR, bookkeeping) · Traffic roll overs · Perform maintenance sweeps 1990-1996 Valley
Builders Van Nuys, CA General
Construction ·
Residential
and Commercial construction ·
Drywall,
tape, and mud ·
Metal stud
framing ·
Painting ·
Plumbing
and electrical ·
HVAC duct
relocation ·
Drop
ceilings ·
Demolitions Education1984-1987Cal
State University Northridge San Diego State University Music major, business minor LicenseCalifornia
state contractor’s license #648634 B-General Building, C-7 Low Voltage Systems,
D-12 Specialty CertificationsCorning
TR-07-S LAN systems World Com Inside Plant Installation Leviton Wildland
fire safety (SDG&E) On track safety (Metrolink) Tunnel safety (Metrolink) Helicopter safety (SDG&E) Substation safety (SDG&E) Experience with no cert: Bucket truck Scissor lift Powder actuated tools Confined space Traffic control Clean room Safety CPR Project ListTehachapi Renewal Energy project. Ft. Knox Army
hospital ( Campus build). Landstuhl Army hospital (Campus build).
Los Angeles mid city light rail expansions (OSP/ISP). Santa Clara
optical backbone, Level-3 (Underground Utility). Denver to Salt Lake optical
long haul joint build, Adesta Communications (Underground and aerial utility)
LAUSD, Glendale unified, San Diego, and Burbank school districts (Campus
builds). UCLA (Reagan medical center and liberal arts campus build).
Pierce college (Campus build) CDOT I-70 corridor, State of Colorado
(Underground Utility). Sprint PCS optical/ Wireless backhaul project Phoenix.
One Las Vegas (Cable T.V. High Rise). Verizon Fios Camarillo (Aerial and
underground utility) San Diego Trolley Green Line, MTS (Aerial
Utility), Optical backbone at Ft. Erwin Artillery range, U.S. Army
(Underground Utility). Bay Area Rapid Transit (Underground utility). Los
Angeles Metrolink, Downtown to Pomona build (Underground utility). MTA
Gold Line (Pasadena). San Francisco metro backbone and bay bridge consortium,
ICG (Underground utility). Metro Backbone in Denver, CO for Time
Warner, MFN, Enron (Underground and aerial). Salt Lake Metro backbone
for U.S.A. Networks (Underground/Aerial utility). Many Campus build
outs. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|